2015年5月7日星期四

The first tank system test platform

The test platform for the fuel tank cover seal test bench. Technical requirements refer QC / T 644-2000 industry standards 4.6 items, safety performance requirements reference GB18296-2001 National Standard 3.1, fuel dispensing pump , test methods refer QC / T 644-2000 5.4 industry standards and national GB18296-2001 standard 4.1.

After the tank is fixed onto the rotary table fixture, in the case of no-load electric flip station tank through 180 degrees, the level of two-dimensional control by the motor will drain cup positioned below the fuel tank cover. Then flip the tank return. Through traffic control device after loading the rated amount of water seal, electronic fuel dispenser the tank through the motor and reducer drive platform rotated 180 degrees, will be stable after 15 seconds in one minute leak peeled weighing control by PLC.

Platform flip back position, then release clip Kaifeng pumping and drain cup rises automatically drained leakage. Users can capture leakage through the computer's weight, print the test results, mechanical fuel level gauge the proposed increase in the rotation when operating platform security features.


没有评论:

发表评论